SEEC Green Energy
Green Energy Development
SEEC is a world-renowned power system equipment supplier. In recent years, it has actively deployed in the green energy industry and transformed into a green power supplier. Its scope covers fisheryand electricity symbiosis and ground-based solar power plants, government public projects, and Taipower turnkey projects. Facing global competition and environmental protection issues, SEEC activelydevelops the green energy industry, expands participation in public projects, and continues to strengthen its core advantages.
In order to fully seize the greenenergy market, we speciallyestablished the brand of "Shihlin Electric Green Power " across business groups in 2022 to quickly build a complete new energy business layout and use green power suppliers (fishery and electricity symbiosis, power plant EPC turnkey ), construction of booster stations (for own use/supply to others), energy storage projects (from planning to maintenance and operation), and green energy applications (charging stations & piles/DC switches/EV Powertrain) are the four main axes of green energy development.
Green Energy Engineering
In terms of green energy engineering, SEEC already has the planning, design, civil engineering, motor, and maintenance capabilities for solar boost stations, unit substations, monitoring systems, and energy storage sites, including the construction of turnkey solar power projects and sites, Energy storage engineering, charging pile manufacturing and charging station construction, PCS and PV inverter introduction, and the production, manufacturing and supply of various AC and DC related high and low voltage products establish the investment and development of comprehensive new energy and green energy.
With its first-class product quality, SEEC has successively managed energy projects from three places, building a solar fishery and electricity symbiosis field energy storage system in Qigu, Tainan, and Hongde Energy has built a 206 MW fishery and electricity symbiosis and energy storage field system in Liuying, Tainan. In addition, there is also the RMB 4 billion turnkey project of building a solar power plant in AUO's Water Forest. From the beginning of clearing 163 hectares of forest land, 178 MW was connected to the grid by the end of June 2023, setting a record for the largest primary power transmission in Taiwan. In 2023, more than 10 green energy engineering, procurement and construction (EPC) projects have been completed and connected to the grid, and another 12 are under construction. Up to now, the market share of solar boost 4 stations and energy storage boost stations has exceeded 60%. In the field of new energy, SEEC has an absolute competitive advantage. In addition, the company also participates in large-scale government public projects and Taipower turnkey projects. In 2023, it received 6 major project cases, all of which are in the construction stage. It plays a very important role in the construction of national public projects. The actual case results are spread all over Taiwan and outlying islands.
Projects of the Ministry of Economic Affairs | |
2008~2013 | •Wanda power plant expansion and Songlin branch hydropower project(Gold Medal) |
2014~2017 | •Connection transformer and ancillary equipment engineering for Tongxiao power plant renewal and expansion project |
2014~2018 | •Mingtan power plant Jugong branch 161kV switchyard renovation project(Gold Medal) |
2018~2021 | •Taichung power plant seawater pump room medium voltage power cable renewal project |
2019~2022 | •Fuhe D/S 161kV 60MVA power transformer GIT new construction project |
2023~2024 | •Taichung power plant new backup main transformer manufacturing and installation project for units 5 to 8(Under construction) |
2023~2026 | •Xingda power plant gas unit renewal and reconstruction plan including transformer and ancillary equipment project(Under construction) |
2023~2026 | •Southern Taiwan Science Park E/S 161kV static synchronous compensator (STATCOM) new construction project(Under construction) |
2023~2026 | •Concorde Power Plant Zhushan Branch expansion project of 4 diesel units(Under construction) |
Projects of the Ministry of Transportation and Communications | |
2017~2022 | •Taitung-Chaozhou section electrification project of the Taiwan Railways Southern Railway(Gold Medal Award for Facility Category) •Taipei electric power section tunnel section conductor railiInstallation turnkey project(Gold Medal Award for Excellence in Construction、Gold Medal for Excellence in Design) |
2021~2026 | •Electrical and mechanical engineering of the main terminal building of the third terminal Area of theTaiwanTaoyuan International Airport(Under construction) |
2023~2026 | •Taiwan Taoyuan International Airport Terminal 3 information and communication system project(Under construction) |
2023~2026 | •Push-pull bus motor system update(Under construction) |
Green Energy Products
Each business group of the company is committed to developing more energy-saving green products (low consumption, low carbon emissions, low environmental impact), and is fully committed to promoting the concept of SEEC green energy through "Shihlin Electric Green Power" participation in exhibitions, briefings, etc. so as to establish a strong and powerful image in the industry that is different from traditional mechanical and electrical plants in the past. Our green products include high-efficiency smart servo motors, special frequency converters for water pumps, special frequency converters for exhaust, hollow shaft servo motors, amorphous molded transformers, new generation transformers, smart monitoring, high-efficiency energy-saving rectifier transformers, ISG Starter generators, EV power systems, charging piles, carbon-reducing silicon steel sheets, vegetable oil transformers, etc. Continue to create carbon reduction and environmental protection benefits for customers.
High Efficiency Product Energy Saving Performance
Product | Benefit | Unit | 2021 | 2022 | 2023 |
High-efficiency oil-immersed transformers | Energy saving | MWh/Year | 15,673 | 13,634 | 7,136 |
Carbon reduction | Ton CO2e/Year | 7,978 | 6,749 | 3,532 | |
Cost saving | NTD Million/Year | 4,702 | 4,090 | 2,141 | |
Amorphous oil-immersed transformer | Energy saving | MWh/Year | 1,806 | 1,565 | 2,046 |
Carbon reduction | Ton CO2e/Year | 919 | 775 | 1,013 | |
Cost saving | NTD Million/Year | 542 | 469 | 614 | |
Variable-frequency drive | Energy saving | MWh/Year | 131 | 171 | 133 |
Carbon reduction | Ton CO2e/Year | 65 | 85 | 66 | |
Cost saving | NTD Million/Year | 41 | 53 | 41 | |
High-efficiency permanent magnet (PM) motor | Energy saving | MWh/Year | 188 | 375 | 288 |
Carbon reduction | Ton CO2e/Year | 93 | 186 | 142 | |
Cost saving | NTD Million/Year | 56 | 113 | 86 |
Note:
- Annual energy-saving degree of frequency converter: 365 calendar days * 24 hours of daily operation * annual total sales volume * calculation of energy-saving power; annual energy-saving degree of high-efficiency oil-immersed transformer and amorphous oil-immersed transformer: 365 calendar days * Calculation based on daily operation of 24 hours*annual total salesenergy-saving power. High-efficiency permanent magnet motor annual energy-saving degree: 250 working days 12 hours of daily operation * annual total sales volume * energy-saving power
- Cost-saving benefits in 2023: energy-saving kilowatt hour * electricity bill (NT$3.0 per kilowatt hour).
- Carbon reduction benefits in 2023: Energy saving degree * electricity emission coefficient (the electricity emission coefficient is calculated using the latest data announced by the Energy Administration of the Ministry of Economic Affairs: 0.494 kg CO2e/degree).
Contact:Sustainable Development Division ESG@seec.com.tw